Land Permit-to-Work

Pattern
Pattern

Land Permit-to-Work

This service allows the customer (short-term contractors) to request a Land Permit-to-work (PTW) to carry activities within Abu Dhabi Ports premises such as Confined space entry, Electrical isolation works, Excavation, Hot works, Work with oversize load, Working at heights, and Work with fire and gas detection systems.

icon-phone
Phone
iconface-to-face
Face-to-Face
icon-app
Mobile App
icon-mail
Email
icon-website
Website

Steps to Follow

STEP01

The customer submits a formal request for Permit-to-work, and submit the necessary documents for obtaining the service.

STEP02

APPLICATION REVIEWED

The application is received and reviewed by ZP PTW office.

STEP03

RECEIVE RESPONSE

PTW office will respond with Approval and issue the PTW or request additional documents before issuing the PTW.

    3

    3

    3

    STEPS

Required Documents

Method of Statement

Risk Assessment

Job Safety Analysis

Third Party Certificates

Engineering Drawings

Required Documents

Method of Statement

Risk Assessment

Job Safety Analysis

Third Party Certificates

Engineering Drawings

Additional Information

Service ChargesPlease refer to the Table of Charges (5% VAT is not included)
Customer TypesBusinesses
The Number of Visits RequiredNA
Number of Interactions to Obtain the Service1
Service OutputApproved Land Permit-to-Work

Table of Charges

Tariff Code

Item

Charges in AED

(5% VAT is not included)

15.1Charges for issue of LAND PTW (Maximum duration of permit shall be 30 days only200 per permit
15.2Charges towards issue of any supplementary Land PTW of Confined space entry, Electrical isolation works, Excavation, Hot works, Work with oversize load, Working at heights & Work with ESD or fire and gas detection systems150 per permit
15.3Renewal of Land PTW mentioned under item no. 15.1 (Maximum duration of permit shall be 30 days only) If work extends beyond the max duration, the old permit to be cancelled and a new permit to be obtained.125 per permit
15.4Penalty towards any unauthorized corrections or modifications in the PTW document.1000 per permit
15.5Supplementary drawings by Facility & Infrastructure Management to Contractors. (Black & White)100 per drawing
15.6Supplementary drawings by Facility & Infrastructure Management to Contractors. (Colour)300 per drawing
15.7Charges towards Engineer visit for any assistance required at site or towards Request for Inspection (RFI)500 per visit
15.8Asset Damage Clearance Certificate100 per certificate
15.9Service charges to Facility & Infrastructure Management for all minor works (apart from regular maintenance works) for others, including stake holders. 1) Technical support by Engineer 2) Mark up charges for ADM1000/-@15% of total value of works