Request for Survey of Foundation for Boundary Wall

Pattern
Pattern

Request for Survey of Foundation for Boundary Wall

Through this service, contractor submits a request to conduct a survey for the location of the foundations of the boundary wall, and the buildings connected to it, immediately after preparing the foundation and before pouring the concrete. The purpose of the survey is to verify that the intended building is within the correct approved limits.

icon-phone
Phone
iconface-to-face
Face-to-Face
icon-app
Mobile App
icon-mail
Email
icon-website
Website

Steps to Follow

STEP01

The project contractor submits a request to survey the foundations of the boundary wall, or the buildings connected to it, through one of the service request channels.

STEP02

APPLICATION REVIEWED

The Investor Relations Officer reviews the application, and then transfers it to the Survey Section for action.

STEP03

RECEIVE RESPONSE

The Survey Section makes appointments and conducts the survey process at the site. Based on the verification process, the contractor is notified of the correctness or incorrectness of the location of thefoundations in order to correct them.

STEP04

APPROVAL GRANTED

A certificate of approval of the location of the foundations is issued in the event that the foundations fall within the permitted spatial accuracy that enables the contractor to pour concrete.

STEP05

REQUEST REVIEW

In the event that the location of the foundations is beyond the allowed accuracy, then it is rejected. The contractor must then correct the error and apply again to the Survey Section to re-survey and verify, and then issue a certificate of approval for the location of the boundary wall foundations.

STEP06

ISSUANCE OF CERTIFICATE

The certificate of approval or rejection is sent to Investor Relations through the system.

STEP07

SERVICE COMPLETION

The investor relations employee sends the boundary wall foundation approval certificate to the contractor through the communication channels.

    7

    7

    7

    STEPS

Required Documents

An official letter regarding the request

A copy of the building permit

A copy of the project general layout plan

A copy of assignment letter of the Contractor or a copy of the contract

A copy of the demarcation certificate of the land

Required Documents

An official letter regarding the request

A copy of the building permit

A copy of the project general layout plan

A copy of assignment letter of the Contractor or a copy of the contract

A copy of the demarcation certificate of the land

Additional Information

Service ChargesNo fees
Customer TypesBusinesses: AD Ports Investors/Contractors
The Number of Visits Required1
Number of Interactions to Obtain the Service2
Link to Other Services Within the EntityProject Completion Certificate
Link to Other Services With External Government EntityProject Completion Certificate
Service Output Survey Certificate for the location of Boundary Wall Foundation

Charges List

No Fees