Request for Land Permit to Work

Through this service, customer can apply for a request to obtain the approval for Land Permit To work (PTW) to carry out the relevant activities within AD Ports Group premises. Approval to obtain PTW is mandatory for all high risk activities to ensure that same is completed through by qualified team using appropriate safety precautions. This is applicable to the following PTW(s) • Land PTW Application; Cold Work • Confined Space Entry • Electrical - Energy Isolation • Excavation • Hot Work • Work with Oversize and Heavy Load • Working at Heights • Work with emergency shutdown (ESD) or Fire and Gas Detection System • Disposal & Dismantling of Major Assets

icon-website
Website
icon-mail
Email
iconface-to-face
Face-to-Face
icon-app
Mobile App
icon-phone
Phone

Steps to Follow

STEP01

Customer submits Permit To Work request through ATLP.

STEP02

Customer to be notified about the approval or rejection.

STEP03

Customer to close the request upon the completion of work and settlement of payment.

    3

    3

    3

    STEPS

Required Documents

PTW application through "ATLP"

Risk Assessment

Method of Statement

Third Party Certificates

Engineering Drawings

Required Documents

PTW application through "ATLP"

Risk Assessment

Method of Statement

Third Party Certificates

Engineering Drawings

Additional Information

Service Charges

Please refer to the Table of Charges

(5% VAT is not included)

Customer TypesContractors/ Tenants
The Number of Visits RequiredNot Applicable 
Number of Interactions to Obtain the Service2
Service OutputApproved Land Permit To Work request

Table of Charges

Tariff Code(s)

Item

Charges in AED

(VAT not included)

14.1
Charges for issue of LAND PTW (Maximum duration of permit shall be 30 days only).
200 per permit
14.2Charges towards issue of any supplementary Land PTW of Confined space entry, Electrical isolation works, Excavation, Hot works, Work with oversize load, Working at heights & Work with ESD or fire and gas detection systems.150 per permit
14.3Renewal of Land PTW mentioned under item no. 15.1
(Maximum duration of permit shall be 30 days only)
If work extends beyond the max duration, the old permit to be cancelled and a new permit to be obtained.
125 per permit