Request for Land Permit to Work

Through this service, customer is enabled to request for Land Permit To work (PTW) to carry out the activities within Abu Dhabi Ports Groups premises. Approval of PTW is mandatory for all high risk activities to ensure that same is executed by qualified personnel using appropriate safety precautionary measurements which is applicable to the following PTW: Land PTW Application; Cold Work, Confined Space Entry, Electrical - Energy Isolation, Excavation, Hot Work, Work with Oversize and Heavy Load, Working at Heights, Work with emergency shutdown (ESD) or Fire and Gas Detection System, Disposal & Dismantling of Major Assets.

icon-mail
Email
icon-website
Website
iconface-to-face
Face-to-Face
icon-app
Mobile App
icon-mail
Others
icon-phone
Phone

Steps to Follow

STEP01

Customer submits the relevant PTW request and attach the applicable/supporting documents.

STEP02

Application is reviewed and approved by AD Ports Group PTW office.

STEP03

Customer pays the applicable fees and take print out of the approved PTW.

STEP04

Closure of request is processed by the customer upon completion of work.

    4

    4

    4

    STEPS

Required Documents

PTW application through ATLP website

Risk Assessment

Method of Statement

Third Party Certificates

Engineering Drawings

Other related documents specified through website based on PTW type

Required Documents

PTW application through ATLP website

Risk Assessment

Method of Statement

Third Party Certificates

Engineering Drawings

Other related documents specified through website based on PTW type

Additional Information

Service Charges

Please refer to the Table of Charges

(5% VAT is not included)

Customer TypesContractors/ Tenants/ Shipping Agents
The Number of Visits RequiredNA
Number of Interactions to Obtain the Service2
Service OutputApproved Land Permit To Work

Table of Charges

Tariff Code(s)

Item

Charges in AED

(VAT not included)

15.1
 Charges for issuance of LAND Permit to Work (Maximum duration of permit shall be 30 days only).
 
200 per permit
15.2Charges towards issue of any supplementary Land PTW of Confined space entry, Electrical isolation works, Excavation, Hot works, Work with oversize load, Working at heights & Work with ESD or fire and gas detection systems.150 per permit
15.3Renewal of Land PTW mentioned under item no. 15.1
(Maximum duration of permit shall be 30 days only)
If work extends beyond the max duration, the old permit to be cancelled and a new permit to be obtained.
125 per permit